Sized to simultaneous peak, not connected load

Plant Utilities & QC Laboratory

The support systems that decide whether the rest of your plant actually performs — compressed air, chilling, steam, CO₂, cooling and the laboratory your BIS licence depends on.

What we deliver
  • LP & 40-bar HP compressors with air recovery
  • Process chillers & glycol circuits for carbonation
  • FRP cooling towers with water treatment
  • IBR & non-IBR steam boiler packages
  • Bulk liquid CO₂ storage & vaporisers
  • BIS-compliant QC laboratory package
BIS / FSSAI
Compliant designs
ISO 9001:2015
Quality certified
24×7 service
Pan-India
01Commonly under-specified

The five utility mistakes we are called in to fix

01

HP air undersized

Pressure sags during the blow cycle. Thin walls, failed drop tests.

02

Chilling undersized

Product above 4°C at carbonation. Fizz never holds in market.

03

Boiler sized on connected load

Short cycling, or a pasteuriser that cannot reach temperature.

04

CO₂ on cylinders

Several times the gas cost, plus stoppages at every bank change.

05

Lab left to the end

BIS inspection arrives, lab and chemist are not ready, certification slips.

Quick start

Tell us your capacity, plot and product.

Itemised proposal, plant layout, and a BIS / FSSAI checklist in 24 hours.

02Catalogue

Product range

Each product page includes the spec sheet, scope of supply, and a direct line to our engineering team. Everything here is priced on request.

Price on Request

Every plant is quoted against your capacity, feedwater analysis, plot and product mix. Send us those and you get an itemised proposal within 24 hours.

FAQ

Frequently Asked

Have a question we haven't covered? Talk to our team on WhatsApp or call us directly.

Because they are the most common reason a correctly-specified machine fails to hit its rated output. Undersized compressed air starves a blower mid-cycle; an undersized chiller means carbonation will not hold; a scaled boiler quietly halves your pasteuriser capacity.
Next step

Plan your line with our engineers.

Quote, plant layout, BIS / FSSAI checklist in 24 hours.