Steam Boiler Package (IBR / Non-IBR)
plant utility

Steam Boiler Package (IBR / Non-IBR)

Packaged steam boilers with feedwater treatment, distribution and condensate recovery.

Price on Request
Capacity
100 – 6,000 kg/h steam
Power Load
5 – 60 kW (auxiliaries)
Footprint
400 – 2,000 sq.ft.
Manpower
1 operator (IBR requires certified)
Overview

Built for the way your line actually runs.

IBR and non-IBR packaged steam boilers fired on oil, gas, biomass or electricity, with feedwater treatment, distribution headers and condensate recovery.

Any plant with pasteurisation, a syrup room, CIP or bottle washing needs steam, and the boiler is usually the utility most under-specified at design stage. We size against the simultaneous peak demand rather than the sum of connected loads, which is usually the difference between a boiler that runs comfortably and one that short-cycles. Non-IBR units below the regulatory pressure-volume threshold avoid IBR compliance and its annual inspection burden, which suits most small and mid-size beverage plants. Feedwater treatment matters more than most operators expect — untreated feedwater scales tubes and quietly destroys efficiency over a season.

Gallery
Steam Boiler Package (IBR / Non-IBR) 1
Steam Boiler Package (IBR / Non-IBR) 2
Best for

Who this configuration suits.

Juice, RTD and dairy beverage plants with pasteurisation
CSD plants with syrup rooms and bottle washers
Any plant running CIP with hot caustic
Plants replacing an undersized or scaled boiler
Plant proposal

Get a detailed quote for the Steam Boiler.

Layout drawing, utility schedule, BIS / FSSAI checklist, itemised quotation in 24 hours.

Scope of Supply

Everything we ship with this plant.

Standard turnkey scope. Optional add-ons quoted on request.

01Packaged shell or coil-type boiler
02Burner (oil / gas / biomass) or electric heating
03Feedwater softener and dosing system
04Deaerator / feed tank
05Feed pumps with standby
06Steam distribution header and pressure reducing station
07Steam traps and condensate recovery
08Blowdown and heat recovery
09Safety valves, controls and IBR documentation where applicable
Technical Specifications

Specs at a glance.

Capacity100 – 6,000 kg/hour steam
Pressure7 – 17 bar
FuelDiesel, FO, natural gas, LPG, biomass or electric
TypeIBR or non-IBR depending on pressure-volume
Efficiency85 – 92% with economiser
FeedwaterSoftened and treated, dosing included
Condensate recoveryStandard, typically 50–70% return
Pricing

Price on Request.

Every plant is quoted against your capacity, feedwater analysis, plot and product mix. Send us those and you get an itemised proposal within 24 hours.

Capacity & automation level

Output, degree of automation and whether you need redundancy on critical stations.

Feedwater or raw material

A high-TDS, iron-heavy or seasonal input changes the treatment train and its cost materially.

Scope boundary

Machinery only, or turnkey with civil drawings, utilities, commissioning and BIS / FSSAI documentation.

Pack formats & changeover

Number of SKUs, bottle sizes and how fast you need to switch between them.

Frequently Asked

Common questions.

IBR or non-IBR boiler?+

Non-IBR if you can stay below the regulatory pressure-volume threshold — it avoids IBR registration, annual inspection and the requirement for a certified boiler attendant. Above roughly 1,000 kg/h most plants end up in IBR territory.

How much steam does a juice plant need?+

It depends on the pasteuriser, CIP and syrup room running simultaneously. A 5,000 LPH juice line typically lands between 600 and 1,200 kg/h. We calculate the simultaneous peak rather than adding connected loads, which usually avoids a size class of over-specification.