Built for the way your line actually runs.
IBR and non-IBR packaged steam boilers fired on oil, gas, biomass or electricity, with feedwater treatment, distribution headers and condensate recovery.
Any plant with pasteurisation, a syrup room, CIP or bottle washing needs steam, and the boiler is usually the utility most under-specified at design stage. We size against the simultaneous peak demand rather than the sum of connected loads, which is usually the difference between a boiler that runs comfortably and one that short-cycles. Non-IBR units below the regulatory pressure-volume threshold avoid IBR compliance and its annual inspection burden, which suits most small and mid-size beverage plants. Feedwater treatment matters more than most operators expect — untreated feedwater scales tubes and quietly destroys efficiency over a season.


Who this configuration suits.
Get a detailed quote for the Steam Boiler.
Layout drawing, utility schedule, BIS / FSSAI checklist, itemised quotation in 24 hours.
Everything we ship with this plant.
Standard turnkey scope. Optional add-ons quoted on request.
Specs at a glance.
| Capacity | 100 – 6,000 kg/hour steam |
| Pressure | 7 – 17 bar |
| Fuel | Diesel, FO, natural gas, LPG, biomass or electric |
| Type | IBR or non-IBR depending on pressure-volume |
| Efficiency | 85 – 92% with economiser |
| Feedwater | Softened and treated, dosing included |
| Condensate recovery | Standard, typically 50–70% return |
Price on Request.
Every plant is quoted against your capacity, feedwater analysis, plot and product mix. Send us those and you get an itemised proposal within 24 hours.
Output, degree of automation and whether you need redundancy on critical stations.
A high-TDS, iron-heavy or seasonal input changes the treatment train and its cost materially.
Machinery only, or turnkey with civil drawings, utilities, commissioning and BIS / FSSAI documentation.
Number of SKUs, bottle sizes and how fast you need to switch between them.
Common questions.
IBR or non-IBR boiler?+
Non-IBR if you can stay below the regulatory pressure-volume threshold — it avoids IBR registration, annual inspection and the requirement for a certified boiler attendant. Above roughly 1,000 kg/h most plants end up in IBR territory.
How much steam does a juice plant need?+
It depends on the pasteuriser, CIP and syrup room running simultaneously. A 5,000 LPH juice line typically lands between 600 and 1,200 kg/h. We calculate the simultaneous peak rather than adding connected loads, which usually avoids a size class of over-specification.

